The Moscow Summit
This overview is excerpted from the NIS
Nuclear Profiles Database. The material presented here was compiled
by Dr. Scott Parrish and Dr. Fred Wehling, CNS Senior Research Associates.
Russian--Iranian Nuclear Cooperation
BUSHEHR NUCLEAR POWER STATION
In January 1995, Russian Minister of Atomic
Energy Viktor Mikhailov and the head of the Atomic Energy Agency of Iran,
Reza Amrollahi, signed a $800 million contract calling for Russia to complete
the first unit of the unfinished nuclear power station at Bushehr by installing
a 1,000MW VVER-1000 light-water reactor at the site within four and a half
years.[1] Construction of a nuclear power station at Bushehr
had been started in 1974 by the German firm Siemens as part of the Shahs
nuclear program. However, work stopped after the Iranian revolution of
1979, and the site was heavily damaged by bombing during the 1980-88 Iran-Iraq
war. Iran tried to find a contractor to finish the plant during the 1980s,
but failed owing to US pressure on possible suppliers. Amrollahi and Mikhailov
also signed a secret protocol to the contract under which Russia and Iran
would conduct talks on a wide range of nuclear assistance beyond the power
reactor. Under this protocol, Russia agreed to open negotiations on providing
Iranian specialists with training at Russian nuclear research centers,
assisting Irans efforts to mine uranium, and supplying Iran with a gas-centrifuge
uranium enrichment facility. The protocol also discussed the possibility
of Russia providing Iran with 2,000 metric tons of natural uranium and
a research reactor.[2] In August 1995, Russia and Iran signed a 10-year
contract under which Russia would supply nuclear fuel, fabricated at the
Novosibirsk Chemical Concentrate Plant, for the Bushehr plant.[3]
Proliferation concerns
Russian and Iranian officials insist the
Bushehr plant is intended solely for peaceful purposes. They point
out that the plant and its facilities will be under the safeguards of the
International Atomic Energy Agency (IAEA), as Iran is a signatory in good
standing of the Treaty on the Non-Proliferation of Nuclear Weapons (NPT).
They further argue that under Article IV of the NPT, Iran is entitled to
develop peaceful nuclear energy, including not only nuclear power plants,
but the entire nuclear fuel cycle, encompassing mining and milling of uranium
as well as enrichment of rector fuel, so long as these activities are carried
out under IAEA guidelines. They also contend that the reactor being
installed at Bushehr is a light water reactor, which presents a relatively
low proliferation risk in any case, as its spent fuel cannot easily be
converted into plutonium for nuclear weapons.
Critics, however, wonder why oil- and
gas-rich Iran needs relatively expensive nuclear energy, and note it makes
even less economic sense for Iran to develop its own uranium mines and
enrichment facilities when it can import reactor fuel more cheaply from
Russia. They also point to the weaknesses of the IAEA inspection
system, which failed to detect the covert nuclear weapons program in Iraq,
which was well-developed and discovered only after Baghdads defeat in
the 1991 Gulf War. Given Irans international reputation, specialists
are not convinced that even the strengthened inspection regime which the
IAEA is introducing under its 93+2 reform program will be sufficient
to guarantee Iran does not develop nuclear weapons. The level of
transparency under the NPT regime is simply not high enough to make such
guarantees reliable.
The Clinton administration and Western
nonproliferation experts were concerned about the proliferation implications
of the proposed power reactor itself, but many of the projects listed in
the secret protocol raised additional alarm, since they could contribute
even more directly to the suspected Iranian nuclear weapons program. The
centrifuge plant was particularly disturbing. Its ostensible purpose
was to enrich natural uranium to five percent U-235 in order to manufacture
power reactor fuel, an activity that is permitted under the NPT. But the
same technology could be applied to make 90 percent enriched uranium, the
raw material for a nuclear weapon. Under pressure from the United
States, Russian President Yeltsin announced at his May 1995 summit meeting
with President Bill Clinton that he was canceling the centrifuge aspect
of the deal. Russian officials later denied that this aspect of the deal
ever existed.[4]
The possibility that Iran will use the
Bushehr reactor directly in its nuclear weapons program, although slight,
cannot be ruled out under the current NPT regime. The VVER-1000 reactor
to be installed at Bushehr will generate spent fuel each year containing
more than 180kg of plutonium.[5] Even reactor-grade plutonium can
be used to build a primitive nuclear device, if Iran were to divert and
reprocess this fuel in violation of its NPT obligations. In addition,
if Iran were to abruptly exit from the NPT at some point (as North Korea
tried to do in 1993), and fuel burnup were reduced, the reactor could produce
a significant quantity of weapons-grade plutonium.[1]
Uncertainty regarding the disposition
of the spent fuel is another troubling aspect of the Bushehr reactor deal.
The best option from the nonproliferation point of view would be to have
Russia take the spent fuel back for permanent storage. (Russia is building
reprocessing and long-term storage facilities for spent fuel from VVER-100
reactors at the RT-2 Reprocessing Plant at Zheleznogorsk (Krasnoyarsk-26)
in Siberia, but as construction has been suspended due to insufficient
funds and environmental concerns, it is not certain when or if these facilities
will be completed.[6]) However, Russian environmental law appears to preclude
the return of spent fuel from foreign reactors.[7] Russian officials have
insisted that the radioactive waste resulting from the reprocessing of
spent fuel should be returned to the country operating the reactor, and
have not been entirely clear about whether Russia will accept the spent
fuel for reprocessing or not. Nor have they clarified what elements
of the reprocessed fuel they might ship back to Iran for storage, again
raising significant proliferation questions.[8]
An even more serious concern is that Bushehr
will provide indirect assistance to different aspects of the suspected
Iranian nuclear weapons program. Moscow is committed to training
Iranian physicists and technicians for Bushehr at the Kurchatov Institute
and the Novovoronezh Nuclear Power Plant.[9] Collaborating with Russian
specialists will greatly increase the knowledge of Iranian nuclear specialists
and improve their access to aspects of Russian nuclear technology.
Collaborating in the construction of the Bushehr reactor, for example,
will yield Iran useful know-how in the construction of a covert plutonium
production reactor, should Iran attempt to base its nuclear weapons program
on plutonium. Cooperation with Russian specialists on uranium mining,
milling, and enrichment could assist Iran in efforts to build a covert
uranium enrichment plant (like that used by Pakistan in its nuclear weapons
program). This is one reason why the centrifuge enrichment plant
provided for under the original reactor deal was so disturbing. Russian
centrifuge technology, while advanced, is less technically demanding than
that of Western Europe, and it was feared that Iran could reverse-engineer
Russian centrifuges, greatly accelerating its efforts to enrich uranium
to weapons grade, if it chooses to take that route to build nuclear weapons.
Even though the Russian government cancelled that part of the Bushehr deal,
legal Russian-Iranian nuclear cooperation could provide a cover for illegal
transfers of nuclear technology from Iran to Russia, which cannot be ruled
out given the financial crisis in the Russian nuclear industry and the
relative weakness of Russian export controls.
Sources:
[1] "Iran, Russia Agree
On $800 Million Nuclear Plant Deal," Washington Post, 9 January
1995.
[2] David Albright et al.,
Plutonium and Highly Enriched Uranium 1996: World Inventories, Capabilities,
and Policies (Oxford: Oxford University Press, 1997), p. 355-361.
[3] ITAR-TASS, 7 February
1996; in Novosibirsk Plant to Supply Iran with Nuclear Fuel, FBIS-TAC-96-003.
[4] Andrew Koch and Jenette
Wolf, "Iran's Nuclear Procurement Program," Nonproliferation Review,
no. 5 (Fall 1997), p. 127.
[5] David A. Schwarzbach,
Irans Nuclear Puzzle, Scientific American, June 1997, p. 63.
[6] "Russia's First Dry
Store," Nuclear Engineering International, December 1996, p. 7.
[7] Izvestiya, 14
December 1995; in "Arrival of Finnish Nuclear Waste Protested," FBIS-SOV-96-001-S.
[8] Mark Hibbs, "Iran May
Keep Russian Spent Fuel or Take Plutonium, REPU, and Waste," NuclearFuel,
18 December 1995, pp. 1,10.
[9] ITAR-TASS, 21 March
1996; in Specialists to Train Iranians for Bushehr Nuclear Plant, FBIS-SOV-96-057.
{Analysis by SDP, adapted
8/6/98 by FW}
FUTURE PLANS FOR POWER REACTOR EXPORTS
In March 1996, Russia's ambassador to
Tehran, Sergey Tretyakov, said that Russia may help Iran build other nuclear
power stations once Bushehr is completed, saying that cooperation between
Russia and Iran on the peaceful use of atomic energy is not confined to
the Bushehr project and that US concerns over that cooperation were "the
problem of the United States, not of Russia."[1] In Tehran on 6 March 1998,
Russian Deputy Prime Minister Vladimir Bulgak concluded a preliminary deal
for the construction of two additional reactors at Bushehr. Minatom
spokesman Georgiy Kaurov stated that "a final deal on the construction
of the next reactors in Iran will come after we have sorted out our relations
with Iran on the first reactor." Apart from emphasizing that the additional
reactor projects were contingent on the sucessful completion of the first
unit at Bushehr, Minatom officials gave no additional details.[2,3]
Sources:
[1] ITAR-TASS, 18
March 1996; in "Russian Nuclear Aid to Iran 'Not Confined' to Bushehr,"
FBIS-TAC-95-005.
[2] "Russia, Iran, Agree
on New Nuclear Reactors," Reuters, 6 March 1998.
[3] ITAR-TASS, 5 March 1998;
in "Russia Agrees to Build Two More Nuclear Reactors for Iran," FBIS-TAC-98-065.{entered
8/14/98 FW}
RESEARCH AND OTHER REACTORS
The January 1995 contract signed by Russian
Minister of Atomic Energy Viktor Mikhailov and Reza Amrollahi, head of
the Atomic Energy Organization of Iran (see entry under Bushehr Nuclear
Power Station), originally included an agreement to provide Iran with a
30- to 50-MWt light water research reactor, but this aspect of the deal
was subsequently cancelled.[1] On 6 April 1998, Yevgeniy Adamov, recently
appointed Minister for Atomic Energy, said that Minatom would like to supply
Iran with a research reactor, which would run on fuel enriched to less
than 20 percent in accordance with IAEA recommendations. He related that
a contract for the sale of the reactor had been drafted in 1996, but awaits
approval by both governments.[2,3] Adamov downplayed US concerns about
Iran's nuclear program by joking that he did not want the recent signals
of a potential thaw in relations between Washington and Tehran "to end
in 15 years at the political level with the US delivering a research reactor
with, say, 90 percent enrichment or exactly the same fuel that is used
in weapons."[4]
There are reports that in January 1995,
Mikhailov and Amrollahi also discussed a potential deal to construct an
APWS-40 nuclear desalination plant, to manufactured by the Experimental
Machine Building Design Bureau (OKBM), but the status of this project is
uncertain.[1]
Sources:
[1] R. Jeffrey Smith, "Administration
Concerned about Russia's Nuclear Cooperation with Iran," Washington
Post, 3 July 1997, p. 3.
[2] Interfax, 6 April 1998;
in "Russia Ready to Build Research Reactor in Iran, FBIS-TAC-98-096.
[3] Vladimir Mikheyev, "Moscow
Will Share the Atom for Peaceful Purposes with Tehran," Izvestiya,
8 April 1998; in "Adamov Maintains Predecessor's Stance on Reactor," FBIS-SOV-98-097.
[4] "Russia Plans New Reactor
in Iran, Official Says," Washington Post, 7 April 1998, p. A3.
Return to the Moscow Summit index.